Progetti di riferimento
In this project, processing the earthing stud was carried out by a 4 column press (manual workstation) for pressing the stud into the car's wheel house. The customer part was not pre-punched.
In the press-in machine, the studs were sorted in a bowl feeder, separated and fed one-by-one into the setting head. Customer parts were inserted manually into the machine and positioned under the setting head. The press-in process was started via the 2 hand control.
Contatti
IT: +39 02 61039788
Modulo di contatto
|
Cookie Information
Per ottimizzare la navigazione nel nostro sito da parte degli utenti, utilizziamo dei cookie. È possibile impedire o regolare i cookie impostando il proprio browser. |